Saturday, 05 September 2026
USD/NPR 151.2EUR/NPR 175.6
नेपाल नेपालका समाचार · WORLD EUROS
Nº 56 Saturday, 05 September 2026
मुख्य समाचार

Panel formed to conduct PNDA has six weeks to prepare report

Panel formed to conduct PNDA has six weeks to prepare report
स्रोत: The Kathmandu Post

A Rapid Damage and Needs Assessment estimates damage caused by the August 26 flood at Rs400 billion.

सबै हेर्नुहोस् — The Kathmandu Post →

देशका प्रमुख सञ्चारमाध्यमबाट संकलित। हरेक समाचार मूल स्रोतमा जोडिएको छ।